MIME-Version: 1.0 Content-Type: multipart/related; boundary="----=_NextPart_01C50323.D054E350" This document is a Single File Web Page, also known as a Web Archive file. If you are seeing this message, your browser or editor doesn't support Web Archive files. Please download a browser that supports Web Archive, such as Microsoft Internet Explorer. ------=_NextPart_01C50323.D054E350 Content-Location: file:///C:/87031CB6/IANMACFARLANECV.htm Content-Transfer-Encoding: quoted-printable Content-Type: text/html; charset="us-ascii"
IAN MACFARLAN=
E
Personal Det= ails |
|
|
|
|
|
|
|
Nationality |
|
British |
|
Profession |
|
Chartered Civil and Structural Engineer=
|
|
Specialization |
|
Project management, structures and rail=
way
infrastructure |
|
|
|
|
|
Year of Birth |
|
1959 |
|
Marital Status |
|
Married |

|
Key Qualifications |
|
Management, planning and organization of proje=
cts. Project and construction management of rail transit systems. Design of rail transport passenger facilities =
and
infrastructure. Quality Assurance audit review of design and
construction activities. Dynamic analysis of structures for seismic and
blast loading. Design and fabrication inspection of structural
steelwork. |
|
Education and Professional Status |
|
HNC Civil Engineering, BSc (Hons) Civil Engineering, Member of the Institution of Civil Engineers, =
1988 Member of the Institution of Structural Engine=
ers,
1990 |
|
Language Ability |
|
English &n=
bsp; Mother
tongue |
|
Papers Presented |
March 1999 |
PUTRA LRT System Two=
for |
|
|
|
|
|
|
July 1999 |
PUTRA LRT System Two for |
|
|
|
|
|
|
March 2000 Nov 2001 |
PUTRA LRT System Two for |
Experience Record |
|
|
|
|
|
|
|
Sept 2002 - Present |
|
Electrowatt Infra Asia Ltd |
|
|
|
Independent Checking / Site Engineering ConsultantsSenior Audit Engineer – Stations and Dep=
ots
Construction Responsible for the Independent site construction inspections of 6
major Stations and several Depots, reviewing and reporting on structural
engineering aspects and general construction quality control. |
|
|
|
|
|
Jan 1988 – Aug 2002 |
|
Halcrow Group Ltd |
|
|
|
|
|
Nov 2001 – Aug 2002 |
|
MRT Chaloem Ratchamongkhon Line, MRTA’s Project Management Consultant (MPMC)Contract Manager – Underground Structures
North Management of the fit-out stage to over=
see
the Supervision Consultant and Contractor during final construction work =
for
9 stations, 12km of tunnel, a major highway flyover section and a
multi-storey Park & Ride building for the MRTA’s North Section
Contract. Total Contract value was $760M. |
|
|
|
|
|
Feb 2000 – Nov 2001 |
|
MRT Chaloem Ratchamongkhon Line, MRTA’s Project Management Consultant (MPMC=
) Technical
Manager The role of MPMC Technical Manager required supervision of a Technical Support Team consisting of 15 full-time staff, with other input= on short-term basis by specialist technical staff. The Technical Team provid= ed support to the Project Management Group and the 6 Contract Works Managers= . The Chaloem Ratchamongkhon Line (former=
ly
known as the Blue Line) is a heavy rail mass rapid transit scheme on a 22=
km
alignment, consisting of 18 km underground in twin and single bored tunne=
l, 4
km cut and cover tunnel / at grade track at the Depot approach, 18
underground stations, 7 intervention shafts and an integrated Depot Facil=
ity
supported by a 22 Ha deck platform. There were six major Contracts consis=
ting
of Underground South, Underground North, Depot, Trackwork, Lifts &
Escalators and an M&E Concession Agreement. |
|
|
|
|
|
Aug 1999 – Feb 2000 |
|
KL Sentral Rail Station and Infrastructure, Dragages Construction – D&B Contractor=
Secondment as Transit Consultant / Coordinator <= o:p> Provided specialist rail
transit and building infrastructure input to the Design Build Contractor =
for
the construction phase of this new multi-level and multi-use rail station=
. KL Sentral Station is t=
he focal
point for |
|
|
|
|
|
Aug 1996-Aug 1999 |
|
PUTRA LRT System 2 f=
or Manager of Technical Support Team for t=
he
Consulting Engineer (CE). Duties involved dealing with design iss=
ues
during construction stage of PUTRA LRT2 Automated Rapid Transit System. PUTRA LRT2 System has an alignment of 2=
9km,
consisting of 22km of elevated guideway, 4.5km of twin-bored tunnels and
2.5km of at grade track. Th=
ere
are 18 elevated stations, 5 underground stations, one at-grade station an=
d a
large Depot Facility with Workshops, Administration Block and Central Con=
trol
building. The system is the
longest, automated and driverless system in the world. |
|
|
|
|
|
Oct 1994- Aug 1996 |
|
Design Manager, Stations and Design manager for stations and depot
buildings team consisting of nearly 40 multi-disciplinary professional and
technical staff for an International Consortium led Consultants Group. The Line 1 capacity expansion project
included a detailed review and assessment of 18 stations and a depot faci=
lity
on an existing ten years old LRT system. The Line 2 high capacity LRT system has=
11
transit stations and a large depot facility along its predominantly eleva=
ted
14km length. Construction of the $900 million commenced late 1997. |
|
|
|
|
|
Apr 1992 – Oct 1994 |
|
General management of satellite office =
with
10 professional and technical staff. |
|
|
|
|
|
1992 |
|
Provided short-term technical assistanc=
e on
a major project proposal with specialist input on large industrial buildi=
ngs
and project management. |
|
|
|
|
|
Jan 1988- Apr 1992 |
|
|
|
|
|
|
|
Oct 1985 - Nov 1987 |
|
|
|
|
|
Senior Engineer, Various Major Projects=
Managing the company's major projects a=
nd
orders for pre-engineered and structural steel buildings ranging from 50T=
e to
600Te with values up to SR8 million. |
|
|
|
|
|
Nov 1984 – Oct 1985 |
|
Babtie Shaw & Mo=
rton,
Consulting Engineers, Glasgow |
|
|
|
Involved in project development at Babc=
ock
Power Works in Renfrew, total project value being £15 million. Also project engineer for an assembly
workshop at Govan Shipbuilders with value £1 million. |
|
|
|
|
|
Apr 1983 - Oct 1984 |
|
ESCAT Co's, Al Assistant Engineer/Project Coordinator<= o:p> Responsible to chief engineer and proje=
ct
managers for engineering and technical services within the company. Involved in major projects at
petro-chemical plants throughout the kingdom, general building projects a=
nd
the development of neighbourhood and commercial centres at |
|
|
|
|
|
1982 |
|
Building Design
Partnership, Undergraduate Engineer Experience gained in the design of adva=
nced
works and main structure for the Waverley Market shopping development in =
|
|
|
|
|
|
1980-1981 |
|
Dinardo & Partners, Consulting Engineers, |
|
|
|
|
|
1975-1979 |
|
Fleming Brothers,
Structural Engineers, Design Draughtsman – Steelwork
Fabrication Employed as a trainee design draughtsman
gaining experience in design, detailing, estimating, fabrication and erec=
tion
of structural steelwork for building structures. Projects worked on included printing wo=
rks,
factory units, petrochemical plants, aircraft hangars and major industrial
buildings. |
|
|
|
|
= IAN MACFARLANE